Construction workers Brad LeClaire (left) and Ed Bourdage (right) hose a construction site as two buildings in the 500 block of South Division Street are demolished yesterday. Short term surface parking will take the place of the two buildings, and eventually an additional parking structure will be put into place. (ALEXANDER DZIADOSZ/Daily)

Janna Hutz

Leave a comment

Your email address will not be published. Required fields are marked *